Case Studies

Highgate Studios

Size

14,350 Sq ft

Location

NW5, London

Photography Credit

Ben Reed

General Projects approached us to transform a vacant unit within Highgate Studios into a Tenant-Ready workspace for future creative occupiers. The existing space was in poor condition and required a considered approach to create a flexible, functional environment that could be adapted by its next tenant. Drawing on the building’s history as a former bottle factory, we developed the design in-house, introducing industrial references through material choices while keeping the layout deliberately flexible.

Project in Brief

  • Tenant-Ready fit out of a single unit within Highgate Studios
  • Concept informed by the building’s history as a former bottle factory
  • Concrete window boxing used as a key design feature
  • Bespoke window frames created for the space
  • Kitchen redesigned as a counter-height coffee bar
  • Limited joinery to maintain flexibility for future occupiers
  • Power distributed through trunking to allow future adaptation
  • Furniture supplied by Platfform
  • Project managed by Gardiner & Theobald

Designing for Future Occupiers

As a Tenant-Ready space, flexibility was central to the design. The unit needed to provide a strong starting point for its next occupier without prescribing how the space should ultimately be used.

The kitchen was redesigned rather than simply replicating the arrangement on the floor above. A counter-height worktop created a more informal coffee bar and provided a practical point for staff to gather during the working day.

Creating Cohesion Through Detail

The client was particularly drawn to the look and feel of the floor above and wanted the new unit to have a similar sense of character and cohesion. Rather than replicate the existing design, we took cues from its aesthetic and reinterpreted them within the new space, creating a complementary look that felt connected while remaining distinctive to the unit.

Alongside the design interventions, existing issues within the unit were addressed as part of the fit out. Poorly installed ductwork lagging was replaced with a higher-quality solution, improving the existing condition rather than simply concealing it behind the finished space.

Related Projects

Space House, Clubhouse
The bar area at the Space House Clubhouse with fluted walnut detailing, terrazzo flooring, and floor-to-ceiling windows, capturing Modus and Platfform’s hospitality-inspired workplace design. Find out more
Space House, Clubhouse
Modus
WC2, London
4,000 SQ FT
Property & Serviced Office

The Clubhouse at Space House was conceived as a vibrant shared hub for all…

Work.Life, Clerkenwell Green
Ground floor café and workspace at Work.Life Clerkenwell Green with a black counter, green tiled wall and exposed brick backdrop, reflecting the collaborative design approach of Two and Platfform. Find out more
Work.Life, Clerkenwell Green
Two
EC1, London
12,000 SQ FT
Property & Serviced Office

Work.Life’s Clerkenwell Green coworking hub brought together Two and Platfform to reimagine…

Finsbury Circus House
Contemporary lounge area at Finsbury Circus House with soft seating, marble coffee tables, and large windows offering views of the street outside Find out more
Finsbury Circus House
Ambit
EC2, London
8,750 SQ FT
Property & Serviced Office

Union Investment Real Estate GmbH appointed Ambit to reimagine the reception and…

Bloomsbury House
Built-in timber shelving and communal table at Bloomsbury House, with views into the meeting room beyond glass partitions. Find out more
Bloomsbury House
Ambit
SW1, London
21,350 SQ FT
Property & Serviced Office

Bloomsbury House is a heritage building right next to the British Museum, but to…

Arbor
Arbor reception lounge with neutral seating, amber accent chairs and timber-panelled backdrop beneath a red grid ceiling Find out more
Arbor
Modus
SE1, London
6,100 SQ FT
Property & Serviced Office
Modus and Platfform came together to create a one-of-a-kind Tenant-Ready™ workspace for Native Land at Arbor, Bankside Yards. Spanning 6,100 sq ft on Level 4 of the UK’s first fossil-fuel-free mixed-use development, the workspace was delivered in just eight weeks, without compromising on character, quality, or flexibility.